Satya Sai Infrastructure - Ongoing Projects.

Kaleshwaram Project
Excavation of lined Gravity Canal with Discharge of 255 cumecs from Srikomaravelli Mallannasagar to package 14,15 and lined parallel canal with discharge of 173 cumecs from Srikomaravelli Mallannasagar to package 17 and its right branch canal to irrigate an ayacut of 40000 acres by water conveyor system with all associated components in Kondapaka Mandal Siddipet District.

Palamuru Rangareddy lift irrigation Scheme
Earthwork Excavation of Approach channel and the open canal from Venkatadri reservoir to Kurumurthiya Reservoir at Karvena (V), including the construction of CM & CD works and Head Regulator at Karvena (V), Bhootpur (M), Mahabubnagar District.




J. Chokka Rao GLI Project Phase II-R.S Ghanpur (V & M)
Warangal Dist. Execution of Earth Work Excavation, Forming Embankment, Construction of CM & CD Works and C.C Lining up to 1 Cumec Discharge for Main Canal, Distributaries, Minors and Sub- Minors under Right Flank Main canal of R.S Ghanpur Reservior up to Yeshwanthapur Vagu with sill level +333.000m and carrying capacity of Main canal for 1,51,0000 Acres and to create Distributary system to provide Irrigation Potential of 40,000 Acres.

Construction of Retaining walls on both sides of existing Nala
From km 0.800 (Naim nagar Bridge) to KM 2.400 (BT/UT on Kakatiya main canal of SRSP).



Construction of Protection Walls
Construction of Protection walls along either side of sammaiahnagar Nala from sammaiahnagar bridge to presidency school in Hanumakonda District.

Modernization of Head works and canal system of Large Tank
Near Nagaram village, Hasanparthy Mandal, Hanumakonda District.